All news

From Drawing to Inspected Part: How Custom CNC Machining Works at Tianyu

Most buyers who send a drawing to a CNC shop are asking three things at once: can this geometry actually be machined, ho...

Who we are and what we take on

Tianyu operates from Dongguan, Guangdong, with approximately 20,000 m2 of production space covering CNC machining, automatic turning, surface treatment, inspection and supporting manufacturing areas. Parts are made to customer drawings or physical samples in aluminium alloys, stainless steel, carbon steel and engineering plastics.

The scope is machined and finished components. We machine, finish and inspect parts; we do not assemble or certify the customer’s end product, and requirements that belong to the final assembly — sealing, electrical performance, end-product certification — stay with the buyer. Being explicit about that boundary keeps the machining request clean.

 

Figure 1  CNC machining floor, Dongguan

Step one: the drawing review that produces the quote

A quote request needs more than a model file. The useful submission contains a 2D drawing, a 3D file (STEP or IGES) or details of a physical sample, plus the material grade and condition, the quantity, the critical dimensions, the required surface finish, the preferred delivery date and any inspection requirements.

Material specification is reviewed before quoting rather than after. For aluminium, the alloy, temper and surface requirement are confirmed together, because machining parameters and finishing suitability change with them. For stainless steel, the grade and the features that must be inspected are reviewed as a pair. Carbon steel requests carry the grade, material condition and coating requirement. Engineering plastics require the polymer and grade, since the choice affects tooling, cutting strategy and how the part behaves in service.

From that review we decide whether the geometry is straightforward milling, whether it needs turning, whether a fixture is required, and which dimensions should be treated as critical. Lead time is quoted only after the part, material and finish are understood.

 

Figure 2  CAD model review and process planning

Step two: machining on 3-axis and 3+2-axis centres

Machining covers 3-axis and 3+2-axis milling, together with in-house turning and finishing. 3-axis work handles the majority of prismatic parts — plates, brackets, housings, flanges — where features sit on accessible faces. 3+2-axis positioning reaches angled faces and multiple setups in fewer operations, which matters when a part has features on several sides and every re-clamp adds error.

Turning covers rotational parts such as connectors, shafts and threaded components, and it is frequently paired with milling on the same part. Surface treatment is carried out in-house, so finish suitability is assessed against the part rather than quoted blind.

On tolerance, standard batch production typically supports plus or minus 0.01 to 0.02 mm. Concentricity down to 0.01 mm and surface roughness down to Ra 0.2 micrometres after treatment are achievable, but both are project-dependent: they depend on geometry, material, fixturing and the finishing route. The right place to fix those numbers is the drawing, before the first chip is cut.

 

Figure 3  Operator at a CNC machining centre

Part families that come through the shop

Requests tend to cluster into a few families. Flanges and connectors are round parts with a central bore, concentric features and a pattern of mounting holes; the work is dominated by turning plus hole patterns, and concentricity between the bore and the mounting face is usually the dimension that decides whether the part assembles cleanly.

Housings and bodies combine a milled exterior with internal cavities, threaded ports and sealing faces. They carry the most setups, which is why 3+2-axis positioning and a purpose-built fixture often decide both accuracy and unit cost.

Threaded and grooved connectors — shafts, adaptors, spigots — are turned parts where thread specification, groove position and runout are checked together. They are small, but a single out-of-tolerance thread stops an assembly line.

A representative example from our part library is a multi-hole flange: a round body with a central bore, a stepped counterbore and six threaded mounting holes. Its drawing is a good illustration of how a simple outline still concentrates tolerance on two or three features.

Step three: 100% inspection before dispatch

Dimensional inspection checks the part against the agreed drawing rather than against a nominal model. We provide 100% inspection and can supply quality and dimensional reports for the project, so the buyer receives measurement data instead of an assurance.

Inspection is most effective when the critical dimensions are marked on the drawing at the quoting stage. A drawing that flags the bore diameter, the centre distance, the concentricity callout and the thread specification lets the inspection plan focus where it matters, and avoids a situation where a part passes a general check but fails on the one feature the assembly depends on.

For parts that combine turning and milling, the inspection plan also verifies the relationship between features produced in different setups, which is where most tolerance losses occur.

 

Figure 4  Dimensional check with a dial caliper

What to send, and what to expect on timing

Send STEP, IGES or PDF files, or arrange to ship a physical sample. Discuss sample delivery before sending a part, so that the inspection of the sample and its return are agreed in advance.

Samples, small-batch trials and mass production are all supported. Prototypes can be available in as little as three days for selected projects; the actual timing is confirmed after the part, material and finish are reviewed. Small quantities are accepted for sample and trial stages, since the purpose of a first article is to prove the process, not to fill a container.

Two practical details shorten the loop. First, state the quantity and the delivery date you are planning against — a prototype request and a 5,000-piece order follow different process plans. Second, say what the part has to do in the assembly. A bore that must locate a bearing and a bore that must pass a cable are different requests, even when the drawing looks similar.

Start with the drawing you already have

Most projects begin with a file that already exists. Send it with the material, quantity, critical dimensions and finish, and the review can start from there. Contact Vera Yao at vera@tianyupro.com, or on WhatsApp at +86 18512832770, or visit www.tianyucnc.com to review capabilities and part examples.

What documents do you need for quotation?

3D drawings (STEP/IGS), 2D engineering drawings with tolerance requirements are preferred. If you don’t have drawings, physical samples or clear photos with dimension marks are also acceptable for evaluation.

What kinds of materials can you process?

We process aluminum alloy, steel, stainless‑steel, engineering plastics and other common materials. Tell us your working environment requirement, we will recommend suitable material options.

What is your typical machining tolerance?

General tolerance ±0.02mm, high‑precision parts can reach ±0.01mm. The actual tolerance depends on part structure, material and processing technology.

Do you support one‑off prototype sampling? What is the sampling cycle?

Yes, we support small‑batch prototype and one‑piece sampling. Normally samples can be finished within 3‑7 working days according to part complexity.

Can you provide inspection reports?

We provide in‑house dimensional inspection reports for each batch. Third‑party inspection can be arranged upon customer request with extra cost and lead‑time.

Do you provide in‑house surface treatment service?

We cooperate with qualified surface‑treatment partners for anodizing, sandblasting, painting, passivation and so on. We manage the whole production chain for your parts.

The next step starts with your drawing.

Let’s talk about your part.

Request a quote